Civcon's Barnsdale Culvert scheme has been shortlisted for Project of the Year (up to £3m) at the CECA Yorkshire & the Humber Annual Awards 2026, with the result decided at the awards dinner on 25 September.

The problem

Goldbeck Solar needed a 100 tonne crane to reach an upper field on its solar farm site at Allerton Bywater. Between the lower and upper field sat an existing culvert with a farm track over it. Neither the culvert nor the track was built to carry that kind of load, and the site sat next to Sheffield Beck, so any solution had to avoid raising flood risk on the watercourse.

The solution

Civcon was brought in on a design and build basis. The first option, lining the existing culvert, was buildable but became disproportionately expensive once fully costed. The team went back to the start and settled on a reinforced concrete slab bridge spanning directly over the culvert instead. Three constraints fixed the design: the slab had to be wide enough for the crane, no load could transfer onto the culvert below, and the finished level could not sit more than 100mm above existing ground. Darts Engineers carried the design risk. Foundations were dug a metre down either side of the watercourse, the slab was cast in place with reinforcement mesh top and bottom, and an Armco barrier was fitted as edge protection. Quality control ran throughout, with inspection and test plans covering steel checks, mesh positioning, formwork and the pour itself, each with a hold point requiring sign off before work continued.

The bridge passed every check. The crane got in, the generators were lifted, and the solar farm is now operational.

The shortlist puts Civcon alongside Barhale, CML, Jackson Civil Engineering and Seymour Civil Engineering. Good company to be in, and congratulations to every team shortlisted.

The team were at the awards night itself: how the evening went. Thanks to CECA Yorkshire & the Humber for the recognition, and to the site team, supply chain partners and client who made the scheme what it was.